Havasu Regional Medical Center is located in a resort-retirement community that creates significant fluctuations in their volume. Primarily, the volume increases during the winter months when the community is heavily visited by retirees desiring warmer climates. The leadership team was under growing pressure to maintain operating margins and recognized there were significant opportunities to improve the efficiency of the OR while reducing waste throughout the entire organization. The leadership also believed that these efforts would improve surgeon loyalty and satisfaction. Unfortunately, previous efforts had stalled in analysis and had been further hindered by the inability to move beyond traditional means to realize strong gains.
Havasu Regional’s leadership team adopted the 100-Day Workout as their accountability structure to ensure continued improvement of the hospital’s surgery workflow. At the recommendation of CBA, the goal was to achieve “One more case per OR suite per day.” Per CBA’s recommendations, Havasu formed four teams and assigned action targets to increase urgency and create a bias toward action. Every person on the four teams was responsible for testing and implementing two successful changes per month that impacted the stated goal. After the OR initiative was underway, it was time to focus on waste elimination throughout the organization. Again, the 100-Day Workout was applied with a result of over $7 million in Quality Waste Recovery efforts.
Strategy Development:With the support of CBA, Havasu Regional organized into continuum teams. Within the larger team, four sub-teams were created along subsets of the entire surgical process. These sub-teams included Diagnosis to Day of Surgery, day of Surgery to Wheels In, Wheels in to Wheels Out and PACU to Discharge. These teams developed and implemented successful changes that resulted in significant savings in overtime while also radically improving the First Case On Time Starts from 45% to 94%.
The second strategic development cycle occurred around targeting of quality waste for elimination. Every manager in the organization was charged with identifying eight changes that simultaneously positively impacted quality and reduced operating costs. The managers were given an overview of Lean, the 7 Categories of Waste, Rapid Cycle Testing, and 84 Proven Change Concepts for hard wiring the gains.
First Case On Time Starts:The Havasu Regional team focused on mar- gin improvement in the OR, which showed great gains in FCOTS. By shifting minutes to the shifts that worked before 3:00 PM, they saved over 100 hours of overtime in one month while improving start times from 45% to 86%. They have continued to make improvements with the following months’ FCOTS at 94%, for a month over month average of 80% improvement over 5 months.
Implementation of Rapid Cycle Testing:Caldwell Butler mentored the Havasu team on Rapid Cycle Testing, producing benefits of reducing fear of failure, creating a culture that values experimentation, and increasing the speed of the organization.
Measurable Benefits:
Intangible Benefits: